Cannon Beach Mesa parking lot project final paved surface
Project — Mesa, AZ

Cannon Beach

Complete parking lot site preparation and paving. Precision grading and flawless execution from start to finish.

Location
Mesa, AZ
Project Type
Commercial Parking
Our Scope
Full Site Prep & Paving

Built Right, Handled Right

We took over mid-stream and delivered without reworks — every phase executed with precision and accountability.
01 / Excavation

Site Excavation

Removed unsuitable material and prepped the site bed for base course installation.

02 / Grading

Precision Grading

Used laser and GPS technology to grade the site to exact design tolerances and drainage specs.

03 / ABC Prep

Base Course

Laid engineered ABC (asphalt base course) to specification, compacted for pavement stability.

04 / Paving

Asphalt Paving

Laid final asphalt surface across the entire lot, finished to high-traffic durability standards.

05 / QA/QC

Quality Control

Inspected and tested every phase, identifying issues early with solutions already in hand.

06 / Handoff

Project Closeout

Delivered a high-traffic-ready lot on time, with zero reworks and clear documentation.

Laser & GPS Precision

High Accuracy, High Speed

State-of-the-art laser and GPS grade control made this parking lot project fast and flawless. Our team graded to exact tolerances, ensuring proper drainage and a foundation ready for asphalt without compromise.

Ground to Finished Surface

Three phases of the project — from raw earth to completion.
Site Grading
Cannon Beach site during grading phase

Early phase: precision grading with laser and GPS systems to match engineered design.

ABC Installation
Cannon Beach during ABC asphalt base course installation

Base course: engineered ABC laid and compacted to spec for stable pavement foundation.

Paving Complete
Cannon Beach parking lot near completion with final asphalt paving

Final phase: asphalt paving finished to durability standards for high-traffic use.

From the Partner

Delivered on promise, on time, and without surprises.

Mikey

Project Partner

Ready to move your project forward?

Start a Conversation