Zaxby's restaurant site at Vineyard Towne Center in Queen Creek, Arizona
Project — Queen Creek, AZ

Zaxby's at Vineyard Towne Center

A new drive-thru restaurant pad. Graded, based, and paved, with the crew staying on until the last patch of asphalt was down.

Location
Queen Creek, AZ
Project Type
Commercial Restaurant
Our Scope
Grading, ABC & Paving Prep
Completed
Summer 2025

Ground Up, In Order

Six phases on a tight commercial site, worked around concrete, utilities, and the vertical build.
01 / Layout

Utility Locating

Found every utility stub, manhole, and grease trap lid on site and marked them with a GPS rover before grading started.

02 / Grading

Site & Pad Grading

Graded the parking areas, the building perimeter, and the drive-thru curve, plus hand work on islands and planters to landscape grade.

03 / Import

ABC Import

Brought in ABC over two days of deliveries, roughly 400 tons a day, and placed it across both parking lots and the full drive-thru.

04 / Compaction

Moisture & Compaction

Moisture-conditioned and rolled every area, plate-tamped the edges, and checked grade with GPS before the pavers showed up.

05 / Tie-Ins

Saw Cut & Tie-Ins

Saw cut and removed existing asphalt where the new lot ties into the surrounding center, so new and old meet clean.

06 / Paving

Paving & Closeout

Stayed on through paving, curb touch-ups, and punch list, then handed over closeout docs and a warranty letter.

Working Around the Build

Grading While the Walls Went Up

With the foundation poured and the wood framing going up, our crew graded the building perimeter, parking, and drive-thru around it. Concrete crews, utility trades, and framers all shared the same small footprint, so we sequenced our work to keep everyone moving.

Zaxby's building foundation with wood framing going up

Dirt to Drive-Thru

The same drive-thru lane, before and after paving.
Before — Prep
Zaxby's drive-thru lane before grading and ABC placement

The drive-thru lane before grading. Next up: bring it to grade and place ABC so asphalt can go down.

After — Paved
Zaxby's drive-thru lane with fresh asphalt in place

Fresh asphalt in place, sitting on a graded, compacted ABC base built to last under daily drive-thru traffic.

Mid-Project Adjustment

Holding a Section for the Utility Line

A new utility line had to run from the back of the building, through the drive-thru, and across the south entrance. Instead of paving over it, we held that section, paved the rest of the site on schedule, and came back once the trench was closed.

Here, our crew grades and compacts that last stretch of drive-thru so it's ready for asphalt, and it matches the rest of the lot.

The Final Push

Summer 2025, straight from our field reports.
Mid-June

Hand Work

Islands, planters, and the drive-thru curve brought to grade.

June 25–26

ABC Delivered

Two days of ABC, about 400 tons each day.

June 30 – July 2

Rolled & Checked

Full site compacted and verified with GPS.

July 9

Main Paving

Parking lots and drive lanes paved.

July 31

Drive-Thru Paved

Final section paved once the utility trench was closed.

August

Closeout

Punch list resolved, warranty letter delivered.